<aside>

Fuzed has already secured multiple sites under LOIs commitments (or pre-leases), marking strong early traction with both public and private landowners. These sites are being structured into two Special Purpose Vehicles (SPVs) — both are asset-light SPVs — for staged deployment over the next 12 months.

</aside>


🌞 Signed solar + EV LOIs

We have secured 11 solar sites to date:

These LOIs represent over 7.2 MWp of minimum solar potential and up to 29k square meters of overhaul solar potential (including parkings and roofs). They are representing up to 62 charging stations.

Each site is covered by either a pre-contractual commitment (LOI) and pre-leased are being finalized for durations between 25 to 35 years.


🚗 Signed EV LOIs & contracts

We have secured 10 sites with EV only deployments. Theses sites are driven by opportunities allowing us to enter into larger discussions with multiple-sites landlords.

Each site is or will be covered by either a contract for a duration between 5 to 10 years. Those sites will transform into Solar for most of them.


🧱 Upcoming SPVs

We are currently finalizing the setup of two dedicated SPVs:

  1. SPV #1 – Asset Light with Enervivo
  2. SPV #2 – Fully owned by Fuzed